Help Center

Frequently Asked Questions

Honest answers about remodeling costs, timelines, licensing, and services from Construction Station — Yucaipa’s trusted general contractor since 2008. CSLB License #1108879.

FAQ

Questions, answered.

Construction Station is Yucaipa's top-rated general contractor, serving the Inland Empire since 2008. We hold CSLB License #1108879, carry full general liability and workers' compensation insurance, and maintain an A+ BBB rating. Our team specializes in kitchen and bathroom remodeling, ADU construction, room additions, flooring installation, and commercial services — delivered with our own W-2 crew, not revolving subcontractors. Call (909) 797-6333 for a free estimate.
Kitchen remodeling in the Inland Empire typically ranges from $35,000 for a mid-grade refresh (new cabinets, countertops, appliances) to $120,000+ for a full luxury build with custom cabinetry, stone countertops, and premium appliances. Cost depends on square footage, layout changes, finish level, and whether plumbing or electrical relocation is required. We provide a transparent, line-item written estimate after your free in-home consultation — no surprise upcharges.
We install all major flooring types: hardwood (solid and engineered), luxury vinyl plank (LVP), laminate, carpet, and tile (porcelain, ceramic, and natural stone). We handle everything from subfloor prep and old flooring removal to transitions and trim for a seamless finish. Whether you're upgrading a single room or re-flooring the entire home, we'll help you choose the right product for your lifestyle, budget, and Southern California climate. See our flooring services page for details.
Yes — ADU construction is one of our core services in Yucaipa and throughout the Inland Empire. We manage the entire process: site assessment, architectural plans, permit submittals to the City of Yucaipa, foundation, framing, MEP (mechanical, electrical, plumbing), finishes, and final inspection. We offer turnkey ADU packages so you have a single point of contact from permits to keys. Call us to schedule a free ADU feasibility consultation.
A standard bathroom remodel runs 4–8 weeks from demo to final walkthrough. A cosmetic refresh — new vanity, fixtures, and paint — can finish in 1–2 weeks. Full gut remodels with custom tile work, layout changes, and new plumbing typically run 6–10 weeks. We provide a written project schedule before signing so you know exactly when each phase starts and finishes. Most clients remain in their homes throughout.
Yes. Construction Station holds California State License Board (CSLB) Contractor's License #1108879. We carry full general liability insurance and workers' compensation coverage on every project. Our license is in good standing and can be verified at cslb.ca.gov. Working with a licensed contractor protects your home, your investment, and ensures all work is permitted and inspected to California building code.
Our primary service area covers Yucaipa, Redlands, Loma Linda, Beaumont, Banning, Calimesa, San Bernardino, Riverside, Rancho Cucamonga, Ontario, Fontana, Upland, Chino Hills, and surrounding Inland Empire communities. For large projects we'll travel further — call us to confirm availability for your address.
Yes. Every project starts with a free in-home estimate. A project coordinator will visit your home, assess the scope, review your ideas, and follow up within 5 business days with a written line-item estimate. There's no obligation and no high-pressure sales pitch. Schedule online at constructionstation.com/contact or call (909) 797-6333.
For most Southern California homes, luxury vinyl plank (LVP) is the top recommendation — it's 100% waterproof, highly durable, pet- and kid-friendly, and performs well in the dry Inland Empire climate. Tile is excellent for kitchens, bathrooms, and entryways. Engineered hardwood offers the warmth of real wood with better humidity tolerance than solid hardwood. Carpet remains popular in bedrooms for comfort and noise reduction. During your free estimate we'll discuss which product best fits your specific rooms, lifestyle, and budget.
ADU construction costs in Yucaipa generally range from $150,000 to $350,000+ depending on size, design complexity, site conditions, and finish level. A modest detached studio (400–500 sq ft) starts around $150,000–$200,000 all-in including permits and utility connections. A two-bedroom, one-bath unit (700–900 sq ft) typically runs $250,000–$350,000. Costs vary with foundation type, lot slope, setback requirements, and interior finishes. We offer a free ADU feasibility consultation to give you an accurate range for your property.
Yes. We partner with Enhancify to offer flexible financing options, including 0% promotional periods and longer-term plans up to 144 months. Pre-qualification is a soft credit pull that won't affect your credit score. Visit constructionstation.com/financing or ask your project coordinator for details during your free estimate.
Get Started

Still have questions?

Call us or schedule a free in-home estimate. We answer during business hours and return all missed calls within 30 minutes. Licensed CSLB #1108879.

Call NowFree Estimate →