Service · Bathrooms

Bathroom Remodeling in the Inland Empire

Walk-in showers, freestanding tubs, heated floors, and tile work that holds up for decades. Properly waterproofed, properly permitted.

Overview

Bathrooms are punishing rooms — water, heat, weight, daily use. A poorly built bathroom rots from the inside out within five years. We’ve been remodeling them across the Inland Empire since 2008 with one rule: build the waterproofing right and the rest takes care of itself.

Our bathroom scope covers everything from a quick guest-bath refresh to a full primary suite gut renovation. Walk-in showers — including curbless, zero-threshold designs — are our most requested upgrade. We waterproof with Schluter Kerdi or Wedi systems before any tile goes down. Linear drains, rainfall heads, body sprays, and frameless glass are all part of the conversation.

Freestanding tubs from Kohler, Victoria + Albert, and MTI Baths are installed with proper structural support and floor-mounted filler lines. We coordinate with structural engineers when cast iron tubs require reinforced floor joists.

Tile work and waterproofing is what separates a 5-year bathroom from a 30-year bathroom. We never use mastic in wet areas. We use Schluter Kerdi, Wedi panels, or RedGard liquid membrane behind every shower wall. Niches, benches, and curbs are pre-sloped and membrane-wrapped.

Vanities and storage can be off-the-shelf, semi-custom, or fully built-in. We fabricate quartz tops with rectangular undermount sinks, vessel bowls, or integrated trough designs. Mirror selections, medicine cabinets, and integrated outlets are part of every vanity wall plan.

Lighting in bathrooms requires layered design — wet-rated recessed cans in the shower, sconces flanking mirrors at face height, and ambient lighting for late-night use. Dimmers and night lights are standard, not upgrades.

Flooring uses large-format porcelain tile, natural stone, or premium LVP. Heated floors (Schluter Ditra-Heat or WarmlyYours) are an affordable upgrade — about $1,500–$3,500 depending on bathroom size, with lifetime element warranties.

Accessibility upgrades — grab bars, comfort-height toilets, curbless showers, widened doorways, and ADA-compliant fixtures — are designed to age in place without looking institutional.

Whether you’re finishing a guest bath for resale or building the spa-like primary suite you’ve sketched for a decade, we bring the same crew, same standards, and same warranty to every job.

Our Process

From idea to reveal.

01

Free Design Consultation

On-site measure, layout discussion, and finish-level walkthrough.

02

3D Design Rendering

See every tile, fixture, and finish before we lift a hammer.

03

Permits & Materials

We handle plumbing and electrical permits and stage materials.

04

Expert Installation

Waterproofing, tile, plumbing, fixtures — same crew, every step.

05

Final Walkthrough

Two-year workmanship warranty + lifetime tile warranty.

FAQ

Questions, answered.

Most full bathroom remodels run 3–5 weeks. Guest bath refreshes (vanity + shower swap) can finish in 10–14 days. Master bath gut renovations with custom tile work, freestanding tubs, and curbless showers run 4–6 weeks. Tile cure times and inspection scheduling are the most common timeline factors.
Begin your project
Ready When You Are

Design the bathroom you've sketched in your head.

Free in-home design consultation. We bring the swatches and the renderings.

Free Estimate
We’ll call within 2 business hours. No obligation.
Call NowFree Estimate →