City Guide · Inland Empire Core

ADU Regulations in Perris, California

Everything you need to know about building an ADU in Perris — size limits, setbacks, permits, and costs.

Max ADU Size
1,200 sq ft
Permit Timeline
60 days
Min Setbacks
4 ft side & rear
Impact Fees
Waived under 750 sq ft
Unit Count

How many ADUs are allowed in Perris?

Single-Family Property
  • 1 Detached ADU (up to 1,200 sq ft)
  • 1 Attached ADU
  • 1 Junior ADU / JADU (up to 500 sq ft)
Total: up to 3 units on your property
Multifamily Property
  • Up to 8 detached ADUs
  • Interior conversions up to 25% of existing units
Scales with your existing unit count

All California cities must follow state-law minimums. Perris follows California AB 68 and subsequent ADU laws.

Regulations at a glance

Perris ADU rules & limits.

ADUs AllowedUp to 3 units on a single-family lot (primary home + 1 ADU + 1 JADU); up to 8 detached ADUs on multifamily lots
Max ADU Size1,200 sq ft
Setbacks4 ft side & rear (CA state baseline)
Height16 ft detached, 25 ft attached
ParkingNot required in most cases; no replacement parking for garage conversions
JADU AllowedYes — up to 500 sq ft; owner-occupancy required if JADU is present
Impact FeesWaived under 750 sq ft (state law)
Permit Timeline60 days maximum (state-mandated review window)
Local Notes

Perris follows the California state ADU baseline. The city's older neighborhoods near downtown have generous lots but aging utilities — we verify panel capacity and sewer condition during the feasibility walk. Newer subdivisions like May Ranch and Villages of Avalon have modern infrastructure that keeps ADU buildout predictable.

Contact: Perris Building and Safety Division

Pre-Approved Plans

City Pre-Approved ADU Plans

Pre-Approved Plans — Check With City

California AB 1332 requires all cities to offer pre-approved ADU plans. Contact the Perris Planning Department to ask about available options.

Contact Perris Building and Safety to ask about pre-approved ADU plans required under AB 1332.

Construction Station can also submit our own engineered plans — no pre-approval needed.

Pre-approved plan availability changes frequently. Always verify current programs directly with your city's Building & Safety Department before starting your project.

Rental Income

What could your Perris ADU earn?

Studio
400–500 sq ft
Estimated rent
$1,200$1,600/mo
Annual income
$14,400 $19,200
1 Bed / 1 Bath
600–800 sq ft
Estimated rent
$1,500$2,000/mo
Annual income
$18,000 $24,000
2 Bed / 2 Bath
900–1,200 sq ft
Estimated rent
$1,800$2,500/mo
Annual income
$21,600 $30,000

Rental estimates based on current Inland Empire market rates. Actual rents vary by condition, amenities, and local demand.

ADU Types We Build

Four paths to an ADU in Perris.

🏠
Detached ADU
Standalone unit up to 1,200 sq ft, built fresh on your lot with its own address, utilities, and entrance.
🚪
Garage Conversion
Convert an existing attached or detached garage into a fully permitted living space — the fastest path to an ADU.
📐
Junior ADU (JADU)
Up to 500 sq ft carved out of the existing home footprint. Streamlined approval under California state law.
🏗️
Room Addition ADU
Attached addition to the main home — adds a bedroom, kitchenette, and bath under one shared roof and foundation.
Our Process

From idea to reveal.

01

Free Feasibility Consultation

We walk your lot, check setbacks and lot coverage, and confirm what your jurisdiction will approve.

02

Design & Engineering

Floor plan, elevations, structural calcs, and Title 24 energy compliance — drawn for your specific lot.

03

Permit Submission & Approval

We submit to your city or county, manage plan-check corrections, and pay the permit fees.

04

Construction

Same Construction Station crew handles foundation, framing, MEP, drywall, and finish — start to keys.

05

Final Inspection & Move-In Ready

Final city inspection, certificate of occupancy where applicable, and two-year workmanship warranty.

Why Perris

Why build an ADU in Perris.

Perris offers some of the best ADU economics in Riverside County: land is affordable, lots are generous, and rental demand keeps climbing with the city's growth. The March Air Reserve Base employment corridor, the massive logistics parks along I-215, Lake Perris recreation traffic, and the Metrolink 91/Perris Valley Line all feed a steady tenant pool for one- and two-bedroom units. Because Perris home prices are lower than the regional median, ADU appraisal lift as a percentage of property value is often higher here than anywhere in the county — and rental income covers a larger share of construction cost. For owners of older downtown properties, an ADU project is also the natural moment to modernize aging utilities and compound the whole parcel's value.

Ready to start?

Ready to build an ADU in Perris?

We’ll walk your lot, confirm what Perris will allow, and ballpark cost before you commit to anything.

Perris FAQ

Perris ADU questions, answered.

How much does an ADU cost in Perris?
Perris ADUs typically run $250–$400 per sq ft for garage conversions, $300–$450 per sq ft for attached room-addition ADUs, and $350–$550 per sq ft for new detached ADUs. A 400 sq ft garage conversion typically lands between $100,000 and $160,000; a 1,200 sq ft detached ADU between $420,000 and $660,000 depending on finish level and site conditions. Your free Perris feasibility consultation ends with a transparent line-item estimate.
How long does it take to get an ADU permit in Perris?
California state law caps ADU plan-check review at 60 days, and Perris processes ADU permits within that window. Total time from signed contract to permit-in-hand typically runs 8–14 weeks, including design, structural engineering, Title 24 energy compliance, and any plan-check corrections. Construction begins immediately after the permit is issued.
Can I rent my ADU in Perris?
Yes — long-term rentals of 30 days or more are allowed statewide in California, and that applies in Perris. Short-term rentals under 30 days are governed by local ordinance and vary by city. We confirm any Perris-specific short-term rental restrictions during your free consultation so there are no surprises.
Do I need owner-occupancy for an ADU in Perris?
No — California permanently removed the owner-occupancy requirement for standard ADUs as of 2026, so you can build and rent an ADU in Perris whether or not you live on the property. The one exception is a JADU (Junior ADU): if you build a JADU, owner-occupancy of either the primary home or the JADU is required.
Does Construction Station build ADUs in Perris?
Yes. Construction Station is a licensed California general contractor (License #1108879) and has been building ADUs across the Inland Empire, Temecula Valley, Desert, and Orange County–adjacent communities since 2008. We handle the entire Perris project — feasibility, design, structural engineering, permits, construction, and final inspection — under one fixed-price contract and one warranty.

ADU regulations change frequently. Always verify current requirements with the Perris Planning Department. This page was last updated May 2026.

Call NowFree Estimate →